Finally got started on the cage today. Got these from XMF.
and this from UTV Inc
Removed the cage (it weighs 70#)
.
Then started designing, cutting, bending.
. Main cage section before final alignment and welding.
Main upper tubes are 1.75x.120 DOM due to the length of the run, the rest is .095 DOM.
Main welded up.
Bracing & tri-angleation cut, fit and being tacked. Lacing is 1.50x.095.
Was not able finish welding, the trigger on my welder quit.
Rear cage and bumper are next...


Removed the cage (it weighs 70#)

Then started designing, cutting, bending.


Main welded up.

Bracing & tri-angleation cut, fit and being tacked. Lacing is 1.50x.095.


Was not able finish welding, the trigger on my welder quit.
Rear cage and bumper are next...